KİLİS NATURAL GAS PIPELINE
Kilis , Turkey

The project is in Kilis, south west of Turkey. The project is a part of the Turkey-Syria Natural Gas Transmission Pipeline Project. It consists of one pigging station and three valve stations. Diameter and length of the pipes are 36” 73.300 m and 8” 1100 m. It is turnkey project including engineering works, procurement and construction. 



Place   Kilis , Turkey
Client   BOTAŞ-Petrolium Pipeline Corporation
Starting Date   16.03.2011
Completion Date   26.12.2011
BACK